Viewing Individual Resource Utilization Details (Gantt Chart)
|
To view details of a team member's (resource), double-click on the resource name in the Sidebar. ()
Note: This topic focuses on viewing resource utilization for a particular user. To view utilization of resources based on a selected task or tasks, see Viewing Resource Utilization.
TO VIEW utilization details for a resource:
- In the Gantt chart, open the Sidebar.
- In the Sidebar, double-click the name of
a team member. The Resource Utilization
Details window opens.
A graph displays the utilization of the resource. Utilization is for
all workspaces for which the resource has task assignments.

The following information is displayed in the graph:
- The vertical axis
measures number of hours of work.
- The horizontal axis
lists days of the month.
- If you had a task selected when you opened the Resource Utilization Details window, this axis starts at the task Start Date.
- If no task was selected, this starts at the current (today's) date.
- Use the date field to jump to another date, or click Today to jump to the current date.
- Gray vertical bars indicate weekend days.
- Yellow indicates the hours the resource is available, based on their workweek calendar.
- Bars in the graph
indicate the number of hours of scheduled work on each day:
- Total number of hours of scheduled work for each day is indicated by the height of a bar.
- Utilization for the current workspace display in blue.
- Utilization for all other workspaces to which the resource is assigned display in gray.
- If the workspace member is over utilized (scheduled work exceeds the number
of available hours, as specified in the workweek calendar and any non-working time), the number of over utilized hours is shown in red.
- To change the time period for which the details display:
- Click the Previous (
) or Next (
) arrows at the top of the details
- Use the date field to specify a date, or
- Click Today to jump the view to the current day
- To close the window, click
OK.